Every project,
one source of truth.

Track every build from lodgement to sign-off - addresses, BCA references, consent status, RFIs, and inspections in one queryable workspace, with an AI co-pilot that can answer questions across all of it.

01 · Consent tracking

From lodgement to sign-off

Every project carries its consent status, open RFIs, and inspections in one place, so you can see at a glance what's active, what's in review, and what's blocked - and why.

  • Live consent and RFI status per project
  • Timeline view across inspections and milestones
  • Blockers surfaced instead of buried in email
Active projects
12 of 47
Bayswater Townhouses
14 Bayswater Rd, Mt Eden
Active
Greenlane Mixed-Use
228 Great South Rd
Review
Onehunga Retail Fitout
9 Princes St
Active
Henderson Warehouse
31 Edmonton Rd
Blocked
Takapuna Apartments
5 Lake Rd
Active
02 · Council-aware

Built around real council process

ARRO is mapped to how each council actually works - their lodgement portals, document naming conventions, and how each one runs vetting and the processing clock. Launching with Canterbury's three BCAs - Christchurch City, Selwyn, Waimakariri - with Wellington-region councils next.

  • Per-council portals and document naming conventions mapped
  • Vetting and processing-clock behaviour tracked per BCA
  • Address autocompletion and BCA linkage on every project
03 · One workspace

Everything in one queryable place

Projects, drawings, specs, consents, and RFIs live together in a single workspace the analyser and co-pilot can see - with access controlled project by project.

  • Drawings, specs, consents, and RFIs alongside the project record
  • The same workspace powers plan analysis and the co-pilot
  • Per-project access control
04 · Inspections & CCC

Through construction to code compliance

Once consent is granted, ARRO tracks the inspection schedule through the build and assembles the Code Compliance Certificate paperwork - PS3s, PS4s, Records of Building Work, and producer statements - so sign-off doesn't stall on a missing form.

  • Inspection schedule tracked stage by stage through the build
  • CCC document checklist - PS3, PS4, RBW, producer statements
  • Missing paperwork surfaced before you apply for the certificate
Inspection schedule
Foundation
Pre-line
Final
Code Compliance Certificate
0 of 9 lodged
Record of Building Work (Form 6A)
Lodged
Certificate of Design Work
Lodged
PS3 - Construction Statement
Lodged
PS4 - Construction Review (B-088 form)
Outstanding
Electrical Code of Compliance
Lodged
Gasfitting Code of Compliance
Lodged
Test certificate for potable water
Lodged
Site inspection reports (engineer)
Outstanding
Form B-068 - Specified Systems Declaration
Outstanding
05 · AI co-pilot

Ask the workspace anything

The same workspace powers a conversational co-pilot. It reads your drawings, consents, and RFIs, grounds every answer with a citation back to the exact sheet, and can draft a council-ready reply in one click.

ARRO agent · 12 Oak Street
session 4f2a
Which projects have an RFI open longer than 10 working days?
What's still outstanding before I can request CCC on 12 Oak Street?
Show me the E2 junction flag on sheet A-201, and draft the RFI reply.
Reply drafted, citing E2/AS1 §9.1.5.
Common questions

Questions we get asked

Which councils is project management built around?

ARRO is mapped to how each council actually works - lodgement portals, document naming conventions, and vetting and processing-clock behaviour - launching with Canterbury's three BCAs (Christchurch City, Selwyn, Waimakariri), with Wellington-region councils next.

Does it handle inspections and CCC, not just consent status?

Yes. Once consent is granted, ARRO tracks the inspection schedule through the build and assembles the Code Compliance Certificate paperwork - PS3s, PS4s, Records of Building Work, and producer statements - so sign-off doesn't stall on a missing form.

What can the AI co-pilot actually answer?

It reads your drawings, consents, and RFIs and answers questions across all of them with a citation back to the exact sheet - for example, which projects have an RFI open longer than 10 working days, or what's still outstanding before requesting CCC on a specific address.

Is this a replacement for our existing project tracker?

It's a single workspace for everything consent-related - projects, drawings, specs, consents, and RFIs together, with access controlled project by project - so the same data also powers plan analysis and the co-pilot rather than living in separate tools.

Now onboarding early teams

Bring your projects into one place.

Be first to bring your projects, drawings, and RFIs into ARRO. Drop your email and we'll reach out as we open up access.

NZBC & council-readyNo spam, everEarly access
Project Management | ARRO